Contact-form intake is not live yet. Contact-form figures come from the old POWR export and stop on 23 Aug 2026. Once the intake is deployed, set contact_form_cutover so the two sources join up.
Leads received
——
Loading…
Lead volume over time
By channel
Change vs the period before
Total leads, both channels
Pipeline right now
Every live lead by stage, mirrored from GoHighLevel
Win rate over time
Share of leads received that month which were won
The dashed section is from Notion, where lead status was not reliably kept up to date. Read it as a floor, not a measurement. The solid section, from 18 Aug 2026, is live pipeline data.
Projection
Estimates, not forecasts — basis stated on each figure